📋 Standard Batch Recipe — 200 Litres
#Raw MaterialQty% w/ StarchRate (₹/kg)Cost (₹)
1Tape Water150 Ltr300%
2Maize Starch Powder50 kg100%₹36.00₹1,800
3Caustic Soda Flakes1.0 kg2%₹45.00₹45
4Borax Powder1.25 kg2.5%₹240.00₹300
Total Batch Cost | Yield: 200 L | Solids: ~25% ₹2,145
Preparation: 100L water + 45kg starch (5 min) → 25L water + 5kg starch + 1kg caustic soda (5 min) → add 25L water → add borax (5 min) → target viscosity 35±5 sec @ 27°C
Batch / Production Calculator
Enter either batches to prepare OR production tonnes — the other fields auto-calculate.
Industry range: 10–18 kg/tonne. Default 14 kg/tonne for 5-ply B flute.
📦 Requirement Calculation Result
Batches (200L)
Glue Yield
Litres
Water Required
Litres
Starch Required
Caustic Soda
Borax Powder
Total Glue Cost
Waste Allowance (5%)
Litres
📊 Monthly Glue Budget — 30 Tonnes/Day × 26 Days
Monthly Production
780
Tonnes / Month
Starch Required
10,920
kg / Month
Batches / Month
218
× 200L batches
Caustic Soda
218
kg / Month
Borax Powder
273
kg / Month
Est. Glue Cost
₹4.7L
Per Month
Based on 14 kg dry starch per tonne of board. Update the starch/tonne figure above to recalculate. Waste is included at 5% buffer.
📝 Record Batch Preparation
📋 Batch Log History
DateShiftBatches Starch (kg)Caustic (kg)Borax (kg) ViscosityProd TGlue CostRemarks
No batch logs yet. Add a record above.
📅 Monthly Glue Consumption Summary
Select a month and click Generate to view consumption summary.
Shift Calculator
Shift Log
Water Quality Log
Monthly Summary
🔥 Boiler Specifications — Cheema Boilers EnergyPac Plus
3,000
Steam Capacity
kg/hr (F&A 100°C)
14.0
Steam Pressure
kg/cm²
82%
Thermal Efficiency
On NCV basis
3,200
Wood NCV
kcal/kg
150–160
Flue Gas Temp
°C outlet
32.75
Boiler Elec. Load
kW (fans + pumps)
Shift Consumption Calculator
📊 Shift Results
Steam Generated (kg)
Fuel Consumed (kg)
Fuel Cost (₹)
Feed Water Required (L)
Blowdown Water (L)
Total Water Used (L)
Steam Cost per kg (₹)
Boiler Electrical Load (kWh)
Total Operating Cost (₹)
📅 Monthly Boiler Cost Projection (26 Working Days × 12 hrs)
Monthly Steam
Tonnes / Month
Wood Required
Tonnes / Month
Wood Cost
₹ / Month
Water Used
kL / Month
Steam Cost/kg
₹ per kg steam
📝 Record Boiler Shift
📋 Boiler Shift Log History
DateShiftFuelHrs Steam (kg)Fuel (kg)Fuel Cost Water (L)PressureFlue T°EfficiencyOperator
No shift logs yet.
💧 Water Quality Requirements — IBR Standard (CBL Spec)
Water quality must be checked and logged regularly. Poor water quality causes scale buildup, reduces efficiency, and can void boiler warranty.
ParameterFeed Water LimitBoiler Water Limit
Total Hardness (as CaCO₃)Max 5.0 mg/LNot Detectable
pH Value8.5 to 9.510.5 to 11.5
Dissolved OxygenMax 0.02 mg/L
TDSMax 250–300 PPMMax 3000 mg/L
Silica (as SiO₂)Max 0.5 mg/LMax 15 mg/L
Total Alkalinity (as CaCO₃)Max 300 mg/L
Residual Sodium Sulphite20–30 mg/L
Phosphates (if added)15–30 mg/L
📝 Log Water Quality Test
📋 Water Quality Log History
DateTypepHHardnessTDSSilicaAlkalinityResult
No water quality logs yet.
📅 Monthly Boiler Summary
Select a month to view boiler performance summary.
Machine Load Register
Energy Calculator
Daily Energy Log
Installed Machine Load Register — WJ-120-2000-II + Boiler + Utilities
AVVNL Chaksu Industrial Rate:7.80/kWh (HT Industrial LT-4, Rajasthan 2025–26). Update rate:
Total Installed Load
— kW
Avg Demand (75% factor)
— kW
Est. Monthly Units (26d×12h)
— kWh
Monthly Bill (Est.)
#Equipment / MotorSection kW/UnitQtyTotal kW Op. Hrs/DayUnits/Day (kWh)₹/Day
TOTAL
🏭 Production-Based Energy Estimate
📊 Energy Projection Results
Total Installed Load
Average Demand (kW)
Units per Day (kWh)
Units per Month (kWh)
Electricity Cost/Day
Electricity Cost/Month
Electricity Cost per Tonne
Annual Electricity Bill (est.)
🎯 Reference: 30 Tonnes/Day × 26 Days × 12 Hours — RCPL Standard Target
Monthly Production
780 T
Tonnes/Month
Total Machine Hours
312 hrs
26 days × 12 hrs
Corrugator Demand
— kW
Corrugator section only
Boiler Elec Demand
32.75 kW
Fans + Pumps + RALV
Monthly Units
kWh/Month
Monthly Bill (₹7.80/u)
Estimated
AVVNL Chaksu Rate Note: Above is approximate. Actual bill includes: Energy charge ~₹7.50–8.50/kWh + Fixed/Demand charge ~₹350–450/kVA/month + FPPCA surcharge + TOD charges. For HT consumers (above 75kW connected load), AVVNL HT-1 tariff applies — contact AVVNL Chaksu division for current notified tariff.
📝 Record Daily Energy Consumption
📋 Daily Energy Log History
DateOpeningClosingUnits (kWh)RateCost (₹)Prod T₹/Tonne